Water Tank Update
![trench to tank](https://streamline.imgix.net/8eb22bad-1e20-4aab-84dd-27263d7648e6/bf1dbc83-7129-47cd-8965-cdf6c25cc36b/TrenchToTank.jpg?ixlib=rb-1.1.0&w=2000&h=2000&fit=max&or=90&s=77986272794f002e30d770bee6c5ab39)
![Plumbing to tank](https://streamline.imgix.net/8eb22bad-1e20-4aab-84dd-27263d7648e6/d9422843-b25f-4b88-af2e-ef1b86be959d/PlumbingToTank.jpg?ixlib=rb-1.1.0&w=2000&h=2000&fit=max&or=90&s=f323c4870b111f0af463d6600a5191d7)
Thank you for your efforts in the Field with the Canebrake Water System. The project is coming along. Continued updates willl be posted.
Charlie and Daryl Holmes, Gunnar Ramstrum, Dean Kuns, Jerry, Josh, Mike Hammond, Rob, Steve, Vie and Mr Mooney all contributed to moving this project along last weekend.
Special thanks to Charlie Holmes for bringing fruit, sandwiches and drinks. Very much appreciated.