8.22.2023 Follow-up to Last Water System Notice

Canebrakers:

A follow-up to our last notice regarding our system. 

No issues reported throughout the system due to the "Storm."

The Peterson Well is pumping as expected since module replacement and the Mooney Well is temporarily off line to make up solar energy transmission loss to SDGE since replacement of control box by Ross Power Solutions.

The Water Manager Dean Kuns is keeping the level of the tank around 8 feet.

Prior to the "Storm," a leak was detected on Upward Trail by Gunnar Ramstrum as he was surveying the line.  Dean Kuns, Gunnar and Chris McDonnald attempted to make repairs but had to put on hold due to bee infestation. (Dean was stung twice.)  Dean, Chris and Gunnar returned next day and exposed the line to begin repairs.  Work was completed days later, prior to HHHH  by Dean,Chris and Bob Mooney. 

Jerry Bucheit